Deep Works - Mine Dispatch & Production Control
Haul Cycle Board
Last 7 Days
John Anderson
Cycle Time
4:30
Mins
Loaded Cycle
2:00 Min
Empty Cycle
2:30 Min
Average Speed
3.4
KM/hr
Loaded Speed
3 KM/hr
Empty Speed
4 KM/hr
Lead Distance
3.4
KM
Optimal Range
Productivity
Avg Trip Count
456
Total Haulage (BCM)
55
Match Factor
1
Opportunity Loss (BCM)
3
Dump and Idle %
Dump Time
2:50 Min
Within Target
Idle %
5%
Within Target
Active Trucks
650
Availability 95%

Hauler Type

Shovel to Dump Flow

Hourly Shift Performance

Hauler Breakdown Summary

Controllable Loss – Dispatch & Operations

42% of shift time

Non-Controllable Loss & Hinderance

Loader Productivity
497 BCM/hr
Utilization: 90%
Productivity (Mins)
Loader Wait Time
3:20
Truck Wait Time
5:56
Loading Time
2:45
Bucket Cycle
0:36
Loader–Truck Balance
Match Factor
1.1
Truck Arrival Rate/Hr
45
Trucks Assigned
8
Passes per Truck
5.6
Payload Compliance
90 %
On Target

Loader Performance by Hour

Loader Inflow and Outflow Trend

All Loaders

Loader Breakdown Summary

Loader Wait Time Summary

Hauler Wait Time Summary

Non-Controllable Loss & Hinderance

Drilling Execution
Drilling Productivity
156
m/shift
/ 150m target
104%
Penetration Rate
18.5
m/hr
Baseline: 17.2
108%
Pattern Completion
92%
holes to spec
Re-drills: 3
92%
Blasting Execution
Blasted Inventory
3,200
BCM
/ 2,000 min
1.6× | 4.2 days supply
160%
Fragmentation Quality
GOOD
Assessment
Boulder: 8% | Fines: 12%
Trend: ↑ 3/5 blasts
85%
Powder Factor
0.42
kg/m³
/ 0.41 design
Variance: +2.4%
±2.4%
Drill Utilization
79%
Operating Time
Target: 75-85%
1. Relocation 2.1h
79%
Explosive Consumption
2,480
kg loaded
/ 2,420 plan
Variance: +2.5%
±2.5%

Drilling Delay Analysis

Hours lost by category (Last 10 days)
Mechanical
Access/Road
Repositioning
Weather
Blast Clearance
Other

Pattern Compliance Heatmap

Drill performance by hole position
Compliant Minor Major Pending

Blast-Ready Holes Analysis

Failure cascade from drilled to ready
100%
Drilled
-8%
Over-drill
-5%
Under-drill
-12%
Water
-3%
Collapse
-4%
Angle
-2%
Stemming
66%
Ready
Top Issue: Water ingress (12%) – Escalate dewatering

Fragmentation Efficiency Curve

Quality score trend (Last 15 blasts)
Actual
Target
Tolerance

Drilling Productivity vs. Geology

Drill 02 & 04 underperforming in hard rock (GU5-GU6) – check bit wear
50 40 30 20 10 0
Drill 01 Drill 02 Drill 03 Drill 04
Few holes Many holes

D&B Cost Breakdown & Trend

Cost per BCM over 12 shifts
$12.50 /BCM
Cost trending -4.2% vs last week
Production
Total OB Moved
42,850 BCM
Plan: 45,000 -4.8%
95.2%
Total Coal Moved
18,420 Tonnes
Plan: 18,000 +2.3%
102.3%
OB Run Rate
3,570 BCM/hr
Target: 3,750 14 active
95.2%
Coal Run Rate
1,535 t/hr
Target: 1,500 6 active
102.3%
Fleet & Resource Readiness
Truck Avail.
89%
16/18 units
Loader Avail.
100%
6/6 units
Support Vehicle Avail.
80%
4/5 units
Truck Utilization
72%
Target: 75% -3%
Controllable Loss
vs prior
12.5 hrs
14%
Target: <8% | Acceptable: <12%
Non-Controllable Loss
vs prior
8.2 hrs
9%
Target: <6% | Acceptable: <10%

Plan vs Actual Production

Cumulative trend (Last 15 days)
OB Coal
Plan
Actual
Gap

Critical Constraints Impacting Plan

Hours lost by constraint type (Last 15 days)
Loader
Truck
D&B
Breakdown
Operator
Other

Hauler Operator Performance

50 operators by performance vs plan
Trips Speed
25 15 5 Trips/Shift
60% 80% 100% 120% 140%
Performance vs Plan
<80% 80-95% 95-110% >110%

Hauler Reliability

Availability % by unit (Last 15 days)
12345 678910 1112131415
>90% 75-90% <75% Planned

Loader Reliability

Availability % by unit (Last 15 days)
12345 678910 1112131415
>90% 75-90% <75% Planned

Loader Operator Performance

25 operators by productivity vs plan
Cycles Fill & Idle
80 50 20 Cycles/Shift
60% 80% 100% 120% 140%
Productivity vs Plan (BCM/hr)
<80% 80-95% 95-110% >110%

Equipment Outliers

ID Type Plan Hrs Actual Var %

Operator Outliers

Operator Role Plan Actual Var %

Production Variance Attribution

Ctrl Cat Reason Var % Events
Unit Cost Metrics
Unit Mining Cost – OB
₹42.50 /BCM
Target: ₹38.00 +11.8%
Unit Mining Cost – Coal
₹850 /t
Target: ₹780 +9.0%
Cost Variance vs Budget
+12.5 %
Target: ±5%
OB Coal
Material Movement & Mine Plan
Strip Ratio
3.2 :1
Plan: 2.8:1 +14.3%
Avg Haul Distance
4.8 km
Target: <4.0 km +20%
Total Material Moved
1.25 M BCM
90.6% of target
Target: 1.38M -9.4%
Direct Mining Costs (Activity-Based)
D&B Cost
₹42.50 /BCM
₹38 ₹45
Target: ₹38.00 +11.8%
Powder Factor
0.82 kg/BCM
0.75 0.90
Design: 0.75 +9.3%
Loading Cost
₹8.20 /BCM
₹7.50 ₹9.00
Target: ₹7.50 +9.3%
Haul Cost Intensity
₹4.25 /t-km
₹3.80 ₹5.00
Target: ₹3.80 +11.8%
Support Equip. Cost
₹1.25 Cr
₹1.10 ₹1.40
Target: ₹1.10 Cr +13.6%
Operating Cost Components (Indirect & Consumables)
Diesel Cost
₹2.85 Cr
2.85 L/BCM +7.5%
Electricity Cost
₹1.85 Cr
Target: ₹1.70 Cr +8.8%
Labor Cost
₹3.85 Cr
₹6.47/BCM +6.9%
Maintenance Cost
₹4.25 Cr
44% unplanned +11.8%
Tyre Cost
₹48.5 L
₹12.50/op hr +11.6%
Equipment Effectiveness & Lost Opportunity
Cost of Lost Time
₹8.5 Cr
₹0 ₹6 Cr ₹8.5 Cr
Target: ₹6.0 Cr +41.7%
Equipment Availability
83%
Haulers
89%
Loaders
81%
Support
Target: 90% | 90% | 85%
Equipment Utilization
72%
Haulers
78%
Loaders
68%
Support
Target: 80% | 80% | 75%
Overall Equipment Effectiveness
53%
240t Haulers
64%
40t Loaders
47%
Dozers
Target: 65% | 72% | 60%