Asset Availability & Utilization
SHIFT TIME
04:15 elapsed
07:45 remaining
SHIFT PROGRESS
40%
ASSET STATUS :
🟢 AVAILABLE
Fleet availability – Haulers
290 (95%)
Planned
300
Running | Standby
280 | 10
Fleet availability – Excavators
50 (105%)
Planned
45
Running | Standby
45 | 5
Mechanical Availability
85%
Available
Planned
90%
Constraint Asset Availability
85%
Available
Planned
95%
Support Equipment Availability
90%
Dozers
10
90%
Graders
8
90%
Haulers Standby Coverage
10
Recovery Needed
2
Operator Coverage
96%
Planned / Available
50 / 48
Top Downtime Drivers
Hours
Critical Asset Breakdown
30 hrs
Non-Critical Asset Breakdown
20 hrs
Availability-Blocking Delays
18 hrs
Planned Maintenance Overrun
10 hrs
Crew / Coverage-Related Loss
8 hrs
Standby / Recovery Capacity Loss
5 hrs
Critical Assets at Risk
Status + ETR
| Asset Type | Status | Maintenance Status | ETR |
|---|---|---|---|
| Shovel EX 03 | Down |
No ETR
|
|
| Shovel EX 05 | Down |
No ETR
|
|
| Shovel SV 01 | In-Repair |
3 Hours
|
|
| Hauler TX 27 | In-Repair |
1 Hour
|
|
| Hauler TX 45 | Ready |
0.5 Hr
|
|
| Hauler TX 54 | Ready |
N/A
|
Major Breakdown Loss (Hours)
8.6 (330%)
Allowance
2.0 hrs
Availability-Blocking Delays (Hours)
20
Allowance
40 hrs
Scheduled Maintenance Variance (Hours)
25
Allowance
20 hrs
Repeat Short Stops (incl. Fuel) Hours
50
Allowance
60 hrs
Tire Alerts
Warning
15
Critical
2
Fuel Alerts
Warning
34
Critical
4
RECOVERY STATUS :
UNCERTAIN